Active Site Show Announcements:

< 2019 >
April
  • 16
    16.April.Tuesday

    Addendum 1 Q&A: 18-0091-02 Eielson AFB Clearing

    All day
    2019.04.16
  • 18
    18.April.Thursday

    Request For Proposal: 18-0091-02 Eielson AFB Clearing - No Site Showing

    8:00 AM-10:00 AM
    2019.04.18

    -> **Please click this PDF for full details.** <–

    NOTE: There is no Site Showing for this project.

    Description of Work: Clearing approximately 13.25 acres along the access trails in an Eielson AFB recreational area.
    • Clear the trees and vegetation back 20’ from the edge of the drivable surface, trails are designated on the map in attachment “C”.
    Specifications:
    • Clearing to be completed by May 31, 2019.
    • Salvage requirement: greater than DBH 6”
    • Chip piece size not to exceed 2” x 2’

    Due Date:
    Proposals must be received by Thursday April 18, 2019 @ 10:00 AM. Proposals received after this time will be returned to the sender and marked “non-responsive.”
    Email: [email protected]   Please call (907) 895-6279 to confirm receipt of email.
    Hand Deliver to: The Salcha-Delta SWCD Office located on the second floor of the Jarvis Office Center, Mile 1420.5 Alaska Hwy, Delta Junction

    Proposal Requirements:
    Submitted Proposal must be completely filled out and signed; and include the company’s name and contact information. In addition, proposal must be initialed at each Addendum item confirming receipt and acceptance.

    Questions and Addendum:
    All questions regarding this RFP must be submitted via email only and received by end of day:

    Monday April 15, 2019
    *RSVP to [email protected] to receive Addendums*
    If questions are submitted they will be answered through an Addendum released via email and on the calendar at salchadeltaswcd.org “contractors-portal” on the following dates:

    Addendum 1: Tuesday April 16, 2019 @ 2:00 PM

    It is the contractor’s responsibility to check for Addendums prior to submitting a proposal.
    A copy of the appropriate contractor’s license and proof of required insurance must be on file with the Salcha-Delta SWCD before contract will be awarded.

    Contact: Michael Phelan, [email protected]

  • 25
    25.April.Thursday

    Site Showing: 17-124 TA 305/306 Trail Repair

    2:00 PM-4:00 PM
    2019.04.25

    **NOTE: Please view attached PDF for full instructions and map.**

    SITE SHOWING

    Release Date: April 18, 2019
    Project Name: TA 305/306 Trail Repair
    SOW #: 17-124
    Location: Yukon Training Area, Salcha AK
    Meet at Firebird Assault Strip, Johnson Road, Yukon Training Area. Attached is a pdf map of the Site Showing meeting location.

    Items of Work:
    Items of work include but are not limited to: Create new hard rock material site. Install a new gravel road (approximately 900 feet), grubbing, grading, aggregate production and placement (blasting and crushing may be required) and culvert installation. Road surface will be 22 feet wide.

    Site Showing Date & Time: Thursday, April 25, 2019 at 2:00 pm
    Project plans, specifications, maps and proposal requirements will be available at the Site Showing. Questions and answers resulting from the Site Showing will be available at the SWCD Contractor’s Portal: https://www.salchadeltaswcd.org/contractors-portal/

    Please RSVP via email for site showing attendance prior to the day of the showing to the Project Manager (see below).

    Requirements: Contractor must be licensed and insured and offer proof prior to award.

    Contact: Earl McNabb, Project Manager: [email protected]

     

    The Salcha-Delta SWCD prohibits discrimination in all its programs on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation and marital or familial status.

     

  • 25
    25.April.Thursday

    Site Showing: 18-106 FWA FP Well 10 Reconfiguration

    2:00 PM-4:00 PM
    2019.04.25

    **NOTE: Please view attached PDF for full instructions and map.**

    SITE SHOWING
    Release Date: April 18, 2019
    Project Name: FP Well 10
    SOW #: 18-106

    Location: Yukon Training Area, Salcha AK
    Meet at Firebird Assault Strip, Johnson Road, Yukon Training Area. Attached is a pdf map of the Site Showing meeting location.

    Items of Work:
    Items of work include, but are not limited to: Cut/fill within the limits of a 10 acre cleared area to create a graded surface. Grub over burden, cut top of hill and fill slopes to 5%.

    Site Showing Date & Time: Thursday, April 25, 2019 at 2:00 pm (Note: this site showing is being held in combination with the site showing for project 17-124 TA 305/306 Trail Repair)

    Project plans, specifications, maps and proposal requirements will be available at the Site Showing. Questions and answers resulting from the Site Showing will be available at the SWCD Contractor’s Portal: https://www.salchadeltaswcd.org/contractors-portal/

    Please RSVP via email for site showing attendance prior to the day of the showing to the Project Manager (see below).

    Requirements: Contractor must be licensed and insured and offer proof prior to award.

    Contact: Project Manager: [email protected]

     

    The Salcha-Delta SWCD prohibits discrimination in all its programs on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation and marital or familial status.

  • 30
    30.April.Tuesday

    Addendum 1: 18-106 FWA FP Well 10

    All day
    2019.04.30