Contractor's portalContractor’s Portal

Welcome to the Contractor’s Portal.  Download Contractor Forms Here.  

Here you can find current information about upcoming site showing announcements.

You can sign up to be on our contractor’s mailing list by sending a message to: [email protected]

 

Active Site Show Announcements:

< 2020 >
June
«
»
Sun
Mon
Tue
Wed
Thu
Fri
Sat
May
1
2
3
4
5
6
7
8
9
10
  • Request for Proposal: 19-106 TA 310 Artillery FP Reconfiguration
  • Site Showing: 19-106 TA 310 Artillery FP Reconfiguration

    Site Showing: 19-106 TA 310 Artillery FP Reconfiguration

    10:00 AM-12:00 PM
    2020.06.10

    Click Here to View Full PDF of Announcement

    Release Date:  June 4, 2020

    Project Name: TA310 Artillery Firing Point Reconfiguration

    SOW #:  19-106

    Location:   Yukon Training Area, Salcha, AK

     Meet at Firebird Assault Strip, Johnson Road, Yukon Training Area. Attached is a pdf map of the Site Showing meeting location.

     Items of Work:

    Approximately 9 acres of cleared area will be shaped and sloped for the reconfiguration of an artillery firing point pad. Estimated cut/fill 6500 CU.YD.

    Construct approximately 1500 feet by 32’ wide tail embankment , cap 6” lift of 3” minus aggregate, crowned 4%, and side slopes and ditches established to no greater than 2:1.

    Project completed and ready for use by August 28, 2020.

    Site Showing Date:   Wednesday, June 10, 2020     Time:  10:00 am

    Project plans, specifications, maps and proposal requirements will be available at the Site Showing.  Questions and answers resulting from the Site Showing will be available at the SWCD Contractor’s Portal:  https://www.salchadeltaswcd.org/contractors-portal/

    Requirements:  Contractor must be licensed and insured and offer proof prior to award.

    Contact:  Michael Phelan, Project Manager: [email protected]

11
12
13
14
15
16
17
18
  • Request For Proposal: PTM-10018-5J Skyline Road Repair
  • Site Showing: PTM-10018-5J Skyline Road Repair

    Site Showing: PTM-10018-5J Skyline Road Repair

    2:00 PM-4:00 PM
    2020.06.18

    Click Here to View Full PDF of Announcement

    Release Date:  June 11, 2020

    Project Name:  Skyline Road Repair

    SOW #:  PTM-10018-5J

    Location:   Yukon Training Area, Salcha, AK

     Meet at Firebird Assault Strip, Johnson Road, Yukon Training Area. Attached is a pdf map of the Site Showing meeting location.

     Items of Work:

    Skyline Road is a on Fort Wainwright managed lands in the Yukon Training Area (YTA).  Approximately 4.9 miles of road corridor will need to be straightened and expanded to a uniform top width of 28’.  Road improvements may include, but is not limited to, vegetation clearing, hard rock ripping, blasting, grubbing, grading, hauling, placement and compaction of approximately 21,500 cubic yards (cy) of cut, 19,500 cy of fill. Base course borrow aggregate will require processing that will include either crushing or screening for approximately 30,700 cy.  D-1 surface course will require approximately 12,600 cy of borrow.  Materials for this project will be obtained from on-site borrow sites in the YTA

     Site Showing Date:   Thursday, June 18, 2020         Time:  2:00 pm

    Project plans, specifications, maps and proposal requirements will be available at the Site Showing.  Questions and answers resulting from the Site Showing will be available at the SWCD Contractor’s Portal:  https://www.salchadeltaswcd.org/contractors-portal/

     Requirements:  Contractor must be licensed and insured and offer proof prior to award.

     Contact Earl McNabb, Project Manager: [email protected]

19
20
21
22
23
24
  • Request for Proposal: 18-0091-2 Eielson AFB Habitat Modification Clearing 2020

    Request for Proposal: 18-0091-2 Eielson AFB Habitat Modification Clearing 2020

    All day
    2020.06.24

    Click Here to Download PDF of RFP Packet

    There will be no site showing for this project

    In general, the Work under this Contract includes, but is not necessarily limited to, the following
    major items as specified in these documents and as shown on the Project Map. The following
    descriptions are provided as an outline of major work items and shall not be construed as an
    inclusive or complete listing of all Items of Work under this Contract.
    Clear vegetation along recreational access trails and selectively clear recreational use and
    access areas.
    Project Completion Date: Saturday, August 15, 2020

    Proposals will be accepted starting on Wednesday, July 01, 2020 at 4:00 p.m. Proposals
    received before this time will be returned to the sender and marked “non-responsive.”
    Proposals must be received by Thursday, July 02, 2020 at 10:00 am. Proposals received after
    this time will be returned to the sender and marked “non-responsive.”
    E-mail to: [email protected] Please call (907) 895-6279 to confirm receipt of email.

    All questions regarding this RFP must be submitted via email only and received by:
    Tuesday, June 30, 2020 @ 10:00 am
    All submitted questions will be answered through an Addendum released via email and at
    salchadeltaswcd.org on the following dates:
    Addendum 1: Friday, June 26, 2020
    Addendum 2: Tuesday, June 30, 2020
    It is the contractor’s responsibility to check for Addendum prior to submitting a proposal

  • Request for Proposal: 18-110/112 DTA 503 Maneuver Trail Maintenance (re-release)

    Request for Proposal: 18-110/112 DTA 503 Maneuver Trail Maintenance (re-release)

    All day
    2020.06.24
  • Site Showing: 18-110 DTA Maneuver Trail Maintenance

    Site Showing: 18-110 DTA Maneuver Trail Maintenance

    10:00 AM-12:00 PM
    2020.06.24

    Click Here to View Full PDF of Announcement

    Please Note: This Site Showing is for a re-solicitation of the previous 18-110 DTA 503 Maneuver Trail Maintenance RFP that was canceled and re-released with a revised Scope of Work.

    Release Date:  June 17, 2020

    Project Name:  DTA 503 Maneuver Trail Maintenance

    SOW #:  18-110

    Location:   Donnelly Training Area, Delta Junction, AK

    Meet at the Jarvis Office Building, Mile 1420.5 Alaska Highway, Delta Junction, AK.

    Due to COVID-19 restrictions, this site showing will be conducted outside
    with appropriate distancing.  Mask use is optional.

    Items of Work:

    Rehabilitate approximately 4.5 miles of existing trail. Items of work include but are not limited to: vegetation management, grubbing, grading, aggregate production and placement, and culvert installation.

    Site Showing Date:   Wednesday, June 24, 2020     Time:  10:00 am

    Project plans, specifications, maps and proposal requirements will be available at the Site Showing.  Questions and answers resulting from the Site Showing will be available at the SWCD Contractor’s Portal:  https://www.salchadeltaswcd.org/contractors-portal/

    Requirements:  Contractor must be licensed and insured and offer proof prior to award.

    Contact:  Steve Bealer, Project Manager: [email protected]

25
26
27
28
29
30
July
July
July
July